We’re Getting There!

Standard

As the kitchen and bath renovations continue here at our mid-century ranch, I feel we have finally turned the corner and that the worst is behind us.

The Armstrong VCT flooring was installed:
101_2472

101_2470

Upper cabinets and lighting are in:

101_2529

101_2530

101_2531

The new ceiling tiles are installed along with the NOS chrome exhaust fan grill cover.

101_2356

Flooring has been sealed and had 3 coats of wax added.

101_2535

We still have plenty of work to do. Installing the lower cabinets. Appliances. Counter tops & back splash. Trim and baseboards. Painting. Staining. Bathroom vanity and toilet install. A bit more plumbing to be hired out. Touch ups and tweaking. The list is LONG.

Gutting your kitchen while continuing to live in your home is not for the faint of heart. Not having a sink or stove (for weeks on end) requires dish washing (and food prep) in the bathroom, utility room or basement sink. Not being able to use of your bathrooms is also a tad inconvenient.

Hopefully my next post will show a bit more “eye candy” instead of the mess!

Stay tuned.

Advertisements

4 responses »

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s